How to Write an RFQ for Custom Machined Parts

The information suppliers need to quote quickly and accurately, plus a copy-paste RFQ checklist.

CAD CAM programming of CNC toolpaths for precision machined parts in India
  • ISO 9001:2015 Certified

    Documented quality management system

  • Mitutoyo Quality Inspection

    Calipers, micrometers, height gauge, DTIs

  • Export-Ready Packaging

    VCI film, ISPM-15 wooden crates

  • RFQ Response in 24 Hours

    Quote within one working day

  • NDA Available

    Your drawings stay confidential

The six inputs an RFQ must carry

Each card is one input: what to state, an example of the right level of detail, and what happens when it is left out. Together they are the whole enquiry.

Drawing and model

The controlling document

State
PDF drawing with the revision mark, plus a STEP or IGES model
Example
PN-4412 rev C, PDF, with PN-4412.step
Why
The PDF carries the tolerances and notes; the model removes geometry guesswork
If omitted
Quoted from a sketch, with assumptions you will have to correct later

Material and grade

Named, not described

State
Grade in a recognised designation, plus condition where it matters
Example
SS 316 annealed, or EN24 hardened and tempered
Why
Price, machinability and availability all move with the grade
If omitted
A substitution is assumed, which may not suit the environment

Quantity

Two numbers, not one

State
Quantity for this order, and expected annual usage, separately
Example
100 pieces now, around 1,200 per year in four releases
Why
Setup is amortised against annual volume, and bar stock bought once
If omitted
Priced as a one-off, so the piece price looks worse than it is

Tolerances and finish

General class plus named exceptions

State
General tolerance class, then the individual fits that matter
Example
ISO 2768-m overall; Ø25 h6 on the bearing seat, Ra 0.8 µm
Why
It separates the few controlled features from the many that are not
If omitted
Everything is treated as critical, and the quote reflects that

Documents required

Asked for now, not after dispatch

State
Material certificate and inspection report requirements
Example
EN 10204 3.1 material certificate; dimensional report on five pieces
Why
Certification is arranged at order stage; it cannot be issued retrospectively
If omitted
A standard inspection report is supplied, with no material traceability

Delivery and terms

Where, when and on whose terms

State
Incoterm with named place, destination port or address, target date
Example
CIF Hamburg, Incoterms 2020, required in week 18
Why
Freight mode, packing and the document set all follow from this
If omitted
The quote carries no freight, or freight to the wrong basis
  1. 01 / 03

    Must-have information

    Drawing (PDF) with revision, 3D model (STEP), material and grade, quantity (per order and per year), tolerances and finish, required documents, delivery address or port and target date.

  2. 02 / 03

    Nice-to-have information

    Target price, application description, current supplier issues and packaging preferences.

    Micrometer measuring a machined component — illustrative machining image
    Illustrative machining and inspection imagery.
  3. 03 / 03

    Checklist

    Part number and revision · Material/grade · Qty/EAU · Critical dimensions highlighted · Surface finish/coating · Certificates required · Incoterm and destination · Required delivery date

Assembling the enquiry in one pass

  1. 01

    Put the NDA in place first

    If the drawing is confidential, sign the NDA before sending anything. It is available on request and takes less time than the quotation itself.

  2. 02

    Export a clean drawing and model together

    A PDF with the revision mark visible, and a STEP file of the same revision. Confirm the two match before they leave your system.

  3. 03

    Mark what is functional

    Highlight or list the two or three dimensions that decide assembly. State the general tolerance class so the rest of the drawing is read correctly.

  4. 04

    Give both quantities and the timing

    First order quantity, expected annual usage and the date you need parts in hand. Say whether the date is for dispatch or for delivery at your address.

  5. 05

    Add the context that cannot be drawn

    Target price if you have one, the application, what the current supplier gets wrong and any packaging preference. None of it is mandatory; all of it improves the answer.

  6. 06

    Send one message, then expect questions

    A complete pack is answered within 24 hours. Where a drawing is genuinely ambiguous, expect a question rather than a silent assumption.

A thin enquiry against a complete RFQ

The same part, enquired about two ways. The difference is not politeness; it is whether the number you receive can be relied upon.

CriterionThin enquiry

Part name, quantity, "best price"

Complete RFQ

Drawing, model, grade, quantities, terms

What the supplier does firstAsks questions, or guessesReviews the drawing and plans the operations
Response timeAs long as the clarification loop takesWithin 24 hours
Confidence in the pricePadded against the unknownsBased on actual cycle time, setup and material
Hidden assumptionsMaterial, tolerance and finish all assumedAny remaining assumption is stated in the quotation
Comparing two suppliersTwo different parts have been pricedTwo prices for the same defined part
First-article outcomeFit or finish surprises are commonMeasured against a drawing both sides agreed
Revisions neededSeveral, often after samplesRare, and usually only on tolerance refinement

RFQ checklist, copy it into your enquiry

Run down the left column before sending. The right column lists what reliably turns a quotation into a conversation.

Include

  • Part number and drawing revision
  • PDF drawing and a matching STEP or IGES model
  • Material grade and condition
  • Quantity for this order and expected annual usage
  • Critical dimensions identified, with the general tolerance class stated
  • Surface finish or coating, with the standard and the acceptance point
  • Certificates required, for example EN 10204 3.1 and a dimensional report
  • Incoterm with named place, destination port or address
  • Required delivery date, and whether it is dispatch or arrival
  • Application, target price and packaging preference, where you can share them

Leave these out of the enquiry

  • A photograph or screenshot of a part with no drawing
  • A drawing with no revision, so nobody knows which issue was quoted
  • A STEP file that no longer matches the PDF
  • Tight tolerances on every feature instead of the functional ones
  • "Export quality" or "as per standard" in place of a named standard
  • A delivery date with no indication of whether freight time is included
  • A request for CMM inspection, in-house material testing or AS9100 or ISO 13485 scope, none of which apply here

The short answer

What should an RFQ for machined parts contain?

Nine things: part number and drawing revision, a PDF drawing with a matching STEP model, material grade and condition, quantity for this order and per year, the critical dimensions and general tolerance class, surface finish or coating, the certificates you need, the Incoterm with its named place and destination, and the required date. Send them in one message and a quotation follows within 24 hours; send a subset and you receive a price built on assumptions.

  • One message with the full pack beats a week of clarification emails
  • Name the general tolerance class, for example ISO 2768-m, then the individual fits
  • Ask for EN 10204 3.1 or an inspection report at RFQ stage, not after dispatch
  • Give both quantities so setup can be amortised honestly
  • NDA available on request before the drawing is sent; no fixed minimum order quantity

Request for quotation

Send your drawing. Get a quote in 24 hours.

Upload STEP, IGES or PDF files. NDA available on request. Quoting: How to Write an RFQ for Custom Machined Parts.

Start your RFQ
Powered byIRPR